Any lift exceeding 40 tons automatically becomes a Critical Lift and requires a formal, written critical lift plan signed off by a Rigger Level 1.
As the horizontal sling angle decreases, the tension on each sling leg increases exponentially.
Alternatively, you can calculate SAF using physical measurements:
A throat opening increase of more than (or 1/4 inch) from the original dimensions. rigger level 3 aramco notes
T=40002×1.5=2000×1.5=3000 kgcap T equals 4000 over 2 end-fraction cross 1.5 equals 2000 cross 1.5 equals 3000 kg
Must be used on all lifts to control structural rotation and swing. They must be made of non-conductive material (like manila rope) and must never be wrapped around a rigger’s hand or body.
10 randomly distributed broken wires in one rope lay, or 5 broken wires in one strand of one rope lay. Any lift exceeding 40 tons automatically becomes a
Aramco is strict on equipment condition. Know the rejection criteria for:
: Use standardized hand signals to direct crane operators and conduct pre-lift toolbox talks to inform the team of risks. Essential Technical Knowledge
Preparation for the Aramco Rigger III exam requires a deep understanding of the following areas: : T=40002×1
Maintain a minimum clearance of 20 feet (6 meters) from overhead power lines up to 50kV. For higher voltages, increased clearance distances are legally required. 7. Standard Crane Hand Signals
: Perform pre-use inspections on all rigging hardware, including slings, shackles, and hooks, and remove any defective gear from service.
Both arms extended horizontally, move hands rapidly back and forth. Note: Anyone on the job site can give the Emergency Stop signal, and the operator must obey it immediately. Final Exam Preparation Checklist
If you'd like to prepare further for the exam, let me know if you want to look at some , review a breakdown of crane load charts , or walk through a sample load calculation step by step . Share public link